Skip to content

The engineering
behind the green.


SPAX Solar Solutions

Commercial-grade rooftop PV, engineered for Singapore's tropical climate and grid.

Our capabilities

On-Grid Systems

Conventional Solar System

BIPV & BAPV

BIPV & BAPV installation

Singapore Green Plan

3 GWp by 2030.

The Green Plan rests on rooftops. The structure underneath rests on us.

Singapore is aiming for at least 3 GWp of solar by 2030, roughly 1,100–1,200 MWh per installed MWp every year.

Those megawatts only count if they keep generating for 25 years. Panels are warranted that long; the structure beneath them must outlast them.

The structure decides whether the megawatt counts.

Monsoon. Uplift. Thermal cycling. Coastal air. The steel and aluminum underneath takes all of it.

SPAX builds that structure. Let’s work toward the Green Plan together.

Singapore Green Plan: target chain

Year National target What it takes on the roof
2030 Reduce emissions to around 60 MtCO2e after peaking earlier Every install commissioned on spec, every megawatt online
2035 Reduce emissions to between 45 to 50 MtCO2e Every megawatt installed still generating five years on
2050 Achieve net zero emissions 25-year arrays installed today still on the roof
Rooftops carry the bulk of Singapore's solar build. Every array that fails inside its 25-year design window is a megawatt subtracted from the path to net zero.
01 04

Public Housing

Mounting structure delivered across HDB precincts in Hougang, Yishun, Sengkang, Bedok, Woodlands, and Tampines under SolarNova 6 & 8.

Healthcare

Mounting structure across SingHealth's KK Women's and Children's, Sengkang General, and Changi General Hospitals.

Education

Mounting structure deployed across the Ministry of Education schools estate, primary, secondary, and post-secondary sites.

Commercial & Industrial

Mounting structure delivered across commercial and industrial rooftops for private-sector clients in Singapore.

The SPAX Standard

A four-stage
engineering process.

From survey to switch-on. BCA ME03 Solar PV System Integration Grade L4 throughout.

Survey

Methodical surveys using checklist protocols to ensure accuracy, mitigate risk, and meet all regulatory requirements.

Design, engineering & drawing

Expert design and drafting built on Professional Engineer specifications. We provide site-specific, compliant drawings engineered for safety, efficiency, and formal approval.

Procure & construct

Install on target, on time, on budget. Ensure high quality standards. Implement site safety. Use proven equipment. Test & commission.

Operate & maintain

Real-time monitoring with expert maintenance and cleaning to ensure system longevity. Corrective repairs and data-driven analytics. We don’t just maintain your solar; we continuously engineer it for higher efficiency.

Capitaland A2, Tuas

Capitaland A2 rooftop solar installation at 20 Tuas Ave 1

Featured projects

The new grid is being built.

Engineer the next green roofs.

Since 2022, SPAX has installed more than 500 roofs across Commercial & Industrial, Ministry of Education schools, SingHealth hospitals, and HDB SolarNova 4, 6 & 8.

Discuss a project